Bottleneck 04 · Recovery
The expensive mistake is the line you never claimed.
Reductions get the attention, but a bill is also wrong when it claims too little: a disbursement paid and never scheduled, travel attended and never entered, a phase total that drops an invoice nobody re-checked.
Good to know
- Vouchers matched to the schedule
- Phase totals reconciled
- Nothing added without your say
- Recovery
- Vouchers vs schedule
- Reconciled
- Phase totals
- Added
- Only with your say
Where it hurts
No one is checking in your favour.
A paying party has every reason to find what you over-claimed. Nothing in the process looks for what you under-claimed, so it survives to the end of the matter unnoticed.
01
A voucher with no schedule line
The court issue fee is in the bundle at page twelve and absent from the disbursement schedule. It stays absent.
02
An invoice the phase total lost
Counsel's advice on quantum is paid and vouched, but sits outside any phase total in the bill.
03
Travel that was attended, not entered
Four attendances have no travel or waiting line against them because the ledger never carried one.
04
Review time split across two dates
A second entry on the same date never carried to the bill, so 2.4 hours are claimed against 3.9 worked.
What it costs
Unclaimed fee is fee you have already earned.
A missed disbursement is money out of your own pocket, and an uncaptured attendance is an evening you gave away. Neither shows up as an error on the file; both show up at the end of the year.
The recovery pass costs one review, and it runs before service.
The cure
Every voucher is matched against the bill.
Instead of reading the bill for errors only, Costs Engine reads the source documents against it.
- 01
Vouchers cross-checked
Each voucher in the bundle is matched to the disbursement schedule, so a paid invoice with no line behind it is raised as a recovery flag.
- 02
Phases reconciled
Fee notes and invoices sitting outside a phase total are surfaced with the phase they belong to, and hours on the ledger that never carried into the bill are surfaced beside them.
- 03
Flagged in pink, not added
Each recovery lands as a pale-pink SUGGESTED · REVIEW REQUIRED row at the foot of Tab 14, with its page or ledger reference. Keep what is real, delete what is not — the pink rows are gone before Tab 13 goes to the court.
- Page
- reference on every flag
- Per phase
- totals reconciled
- 0
- lines added without you
Questions
Asked at this point in the file.
Next step
Bring a matter you have already billed.
The fastest way to see the recovery pass is on a closed file where you know what the total should have been.
Recovery
Claim what you did. Then argue about the rest.
Costs Engine matches every voucher in the bundle against the schedule, so the line you paid for is at least in front of you before you sign.
One reply, one call, one decision. We will not add you to a sequence.
